Completed Projects

Kovanlık Regulator and HEPP Project

The Kovanlık Regulator and HEPP Project located in Bulancak District of Giresun City, has an installed power of 57,215 MW and an annual electricity production capacity of 154 million 130 thousand kWh. The productions we are doing for the this hydroelectric power plant are as follows

Details

Siemens Delta 4000 Housing Manufacturing

Bearing body of the rotor part of the weather vane propeller.

Details

Sasa DTY Coil Transport Trolleys

Our mass production continues within the scope of the bobbin transport trolleys used in the texturing department.

Details

Çekerek 1-8 HEPP Hydromechanical Works

The following equipment is produced within the scope of the project.

Details

Yatağan Thermal Power Plant

The following works are carried out by our company within the scope of the steel manufacturing and assembly works of the Yatağan Thermal Power Plant located in the Yatağan district of Muğla.

Details

Iraq Ramadi Dam

The following works are carried out by our company within the scope of the Ramadi dam revision works.

Details

Kars Dam

The following manufacturing and assembly works are carried out by our company within the scope of Kars dam bottom outlet hydromechanical works.

Details

Sabirabad Irrigation (Azerbaijan)

The following works are carried out by our company within the scope of the Ramadi dam revision works.

Details

Çates Thermal Power Plant

Work done:

Details

Zetes-3 Thermal Power Plant

Steel fabrications and cooling water pipelines of Zetes-3 Thermal Power Plant built by Eren Energy in Zonguldak Çatalağzı were built by our company.

Details

Büyükkumla Dam

Within the scope of Büyükkumla dam hydromechanical works, the manufacturing and assembly works of the following works are carried out by our company.

Details

Tufanbeyli Thermal Power Plant

With the goodwill agreement made with SK&EC, the main contractor of the thermal power plant with an installed power of 450 MW in Adana province Tufanbeyli district, various equipment and construction procurement and assembly were made by our company between 2014-2016.

Details

Ahmetli HEPP

Manufacturing and installation of Ø3000mm penstock and 450 tons of all hydromechanical works in Ahmetli HEPP project located in Karaisalı district of Adana province are carried out by our company.
The radial gates of the Ahmetli HEPP Project located in the Karaisalı District of Adana Province have been completed by our company.

Details

Göktaş 1-2 HEPP

Details

Akpınar HEPP

All 220-ton hydro mechanical works of Akpınar HEPP project located in Pazarcık district of Kahramanmaraş province were manufactured and assembled by our company.

Details

Sebil Regulator and HEPP

Due Date: 2014
Employer: Sebil Energy Electricity Production Industry and Trade Inc.
Completed Work: 5 Cover Manufacturing and Installation
Quantity: 72 Ton

Details

Doğançay HEPP

Yamanlı HES Steel Bridge manufacturing and installation was done by our company.

Details

Pirinclik Regulator and HEPP

28 Cover Manufacturing and Installation
Quantity: 290 Tons

5 Cover Manufacturing and Installation
Quantity: 160 Tons

Intake structure fabrication and installation of entrance grills
Quantity: 111 Tons

Details

İmamoğlu - Misis Irrigation

The manufacturing and assembly of Mak-Omak Covers, which are within the scope of İmamoğlu and Misis Irrigation projects, which were built by DSİ 6th Regional Directorate, were made by our company.

Details

Bukor 2 Regulator and HEPP

13 Cover Manufacturing and Installation
Quantity: 330 Tons
Due Date: 2014

Details

Gökboyun Regulator and HEPP

6 Cover Manufacturing and Installation
Quantity: 34 Tons
Due Date: 2014

Details

Morgedik Dam

Ø1626 Penstock Pipe
Quantity: 94 Tons
Due Date: 2014

Details

Yamanlı HEPP

Yamanlı HES Steel Bridge manufacturing and installation was done by our company.

Details

Erem Regulator and HEPP

Ø1250 Penstock Pipe
Quantity: 113 Tons
Due Date: 2014

Details

Orta Ceyhan Menzelet Project Guided Irrigation

16 Cover Manufacturing and Installation
Quantity: 100 Tons
Due Date: 2014

Details

Akdere HEPP

Details

Çakıt HEPP

Details

Shear Regulator and HEPP

7 Cover Manufacturing and Installation
Quantity: 55 Tons
Due Date: 2011

Details

Kovanlık HEPP

Within the scope of Kovanlık HEPP hydromechanical works, the manufacturing and assembly works of the following works are carried out by our company.

Details

Tüfekçikonağı HEPP

Details

Eren HEPP

Details

Kalecik 1-2-3 HEPP

Details

Toros HEPP

Details

Bükor HEPP

Details

Gök HEPP

Details

Musabeyli Dam Diameter 1000 mm Butterfly Valve

Details

Başyayla Pond 750 * 750 Gate Valve

Details

Yukarı Çağlar Pond 400 * 400 Gate Valve

Details

Yukarı Caglar Pond 600 * 600 Terrestrial Gate Valve

Details

Crane Manufacturing

Our crane manufacturing includes overhead cranes, gantry cranes and jib cranes.
Overhead cranes; they can be manufactured with single beam and double beam bridge. Manufacturing overhead cranes with different offers on customer requests.

Details

Çayaltı 1 HEPP / Çayaltı 2 HEPP

Renewal of cover slots.
Cover sealing gasket replacement and sealing settings
Sandblasting and painting of all covers and penstock pipes.
Hydraulic cylinder revisions.
Changing the automation system.
New productions.
Manufacture of grill cleaning machine.

Details

Dereköy HEPP

New manufacture and installation of expansion joints
Cover sealing settings
Hydraulic and automation system revisions

Details

Eğlence HEPP

Correction of axial displacements caused by penstock shifting.
New penstock and slide bearing manufacturing.
Expansion gasket manufacturing.

Details